Construction of a fruit trade and logistics center with a capacity of 450 tons has begun in the Ala-Buka district of Kyrgyzstan, based at a multi-sector agricultural cooperative.
According to the Ministry of Agriculture of Kyrgyzstan's press service, equipment for fruit drying has already been purchased, and preparations are underway to install it. The construction is being carried out in two phases: During the first phase, two fruit storage facilities with a capacity of 300 tons each were built.
In 2025, the completion of a refrigerated warehouse with a capacity of 450 tons (three refrigerators of 150 tons each) is planned, along with the launch of a fruit washing facility costing 850,000 soms.
Additionally, the facility is already equipped with equipment for fruit packaging and freezing.
Source: www.vb.kg